GUINEA GOLD PROJECT

APRIL, 2015 – SIGUIRI, GUINEA GOLD PROJECT

DOVE supplied Gold Alluvial/Placer Processing Plant to Siguiri, Guinea. The capacity of the plant is 150 – 170 tons/hour. The mine is associated with presence of gold and heavy mineral sands. The processing plant is designed for recovery of gold, by gravity method and dry magnetic separation.