In July 2017 DOVE® shipped a complete processing plant for river mining operation to Angola. DOVE® supplied a RIVERMINER®, capacity of 80 m3/hr (slurry), for recovery of gold & diamonds from riverbed.

DOVE® RIVERMINER® is a combination of the Dredge and Floating Processing Facilities on pontoon. The combination of the Dredge and Floating Plant, installed on-board, provides the convenience of the continuous operation on the river, eliminating the hassle of transporting the material on-shore. The Floating Plant is designed for the recovery of coarse & fine mineral production. The plant will be commissioned on the second quarter of 2018.