alluvial precious stones project / Nigeria / 2024
SUPERMINER® mobile plant, capacity 200 TPH.
DOVE supplied SUPERMINER® (SC-200D) fully integrated Mobile Processing Plant with processing capacity 200 tons per hour for recovery of precious stones in Nigeria.
Plant site preparation, site assembly, installation, test run and training was performed by DOVE technical team in July 2024.
Plant is configured with the large feed hopper (4.5 x 4.5 x 2.8) meters, designed to be fed by Earth-Moving equipment, as well as the large vibrating grizzly for reject of oversize rocks, and 25-meter conveyor belt assembly for continuous feeding the ore to the processing plant.
Plant is supplied with heavy duty classifier, configured with clay-breaker mechanism and scrubber component and high-pressure hydraulic network for effective breaking the heavy clay ore.
The plant is also configured with primary concentrators as well as secondary concentrators to ensure 100% recovery of all precious stones with No-Loss.
The plant is also configured with complete security system to protect the production from unauthorized access.
Plant is configured on full size trailers in order to facilitate ease of logistics and movement of the plant to a new site.
The configuration of mobile plant also eliminates the time and additional expenses for site construction, which is normally required for stationary plants, which resulted in saving as well speeding up the plant production start-up.
Plant is 100% environment-friendly and is configured with complete hydraulic network, using only recycled water to comply with environmental safety.
Plant is configured for future upgrade and addition of tailing management module.