ALLUVIAL (PLACER) GOLD MINE / NIGERIA / 2025

SUPERMINER® (COMPACT SERIES) GOLD PROCESSING PLANT, 25 TPH.

SUPERMINER® (Compact Series) with a processing capacity of 25 tons per hour was designed for Placer Alluvial gold recovery in Nigeria. The plant mainly serves as a startup operation and pilot processing plant, for a professional Gold mining operation, with the highest production recovery.

The processing plant is fully mobile, designed on two full-size trailers, and includes a complete Bulk Feeding Module, Grizzly Classifier, Conveyor Assembly. Multi-Stage Classifier, Concentrator for coarse gold particles over 2 mm, as well as Concentrator for fine gold particles below 2 mm.

SUPERMINER® (Compact Series) is also configured with Production Security System to protect Gold production against unauthorized access and theft of production.
The processing plant is also configured with fully integrated Electrical Network, as well as an integrated Hydraulic Network.

SUPERMINER® (Compact Series) Gold Processing Plant is 100% Environmentally Friendly, uses only Recycled water, does not use any chemicals.

SUPERMINER® (COMPACT SERIES) GOLD PROCESSING PLANT, 25 TPH — PHOTOS

SUPERMINER® Compact Series 25 TPH Mobile Processing Plant at DOVE factory
SUPERMINER® Compact Series DOVE Mobile Gold Processing Plant
Mobile Dry Feeding System
SUPERMINER® Compact Series, gold processing plant, 25 TPH