HARD ROCK GOLD MINE / CAMEROON / 2025
SPEEDMINER® MOBILE HARD ROCK GOLD PROCESSING PLANT, 2 TPH.
DOVE SPEEDMINER® Mobile Hard Rock Gold Processing plant with capacity of 2 TPH for pilot and exploration of the gold mine in Cameroon.
he plant is fully mobile, configured on four full-size trailers, and designed for rapid deployment in the field. It was shipped in 40-foot containers.
The SPEEDMINER® plant is configured with a Mobile Bulk Feeding Module, Vibrating Feeder, Conveyor Assembly, Two-Stage Crushing, Screening, Milling, and Concentrator.
The SPEEDMINER® plant is also configured with a fully integrated mobile Power plant Generator, including a complete built-in Electrical and Hydraulic network and a Centrifugal pump.
The plant is further configured with a Water treatment module to clean the recycled water supplied to the high-pressure injection pump, which supplies water to the Centrifugal Concentrator.








