ALLUVIAL (PLACER) GOLD MINE / NIGERIA / 2025
SUPERMINER® (COMPACT SERIES) GOLD PROCESSING PLANT, 15 TPH.
SUPERMINER® (Compact Series), with a processing capacity of 15 TPH, was designed for Placer Alluvial gold recovery in Nigeria. This fully mobile plant is suitable for startup and pilot operations, providing professional Gold processing with the highest production recovery.
The plant is mounted on two full-size trailers and configured with a complete Bulk Feeding Module, Grizzly Classifier, Conveyor Assembly, Multi-Stage Classifier, Concentrator for coarse gold particles over 2 mm, and an additional concentrator for fine gold particles below 2 mm.
SUPERMINER® (Compact Series) is supplied with a Production Security System to protect Gold production against unauthorized access and theft of production.
The processing plant includes a fully integrated Electrical Network and Hydraulic Network.
SUPERMINER® (Compact Series) Gold Processing Plant is 100% Environmentally Friendly, uses only Recycled water, and does not use any chemicals.

