SIERRA LEONE / GOLD & DIAMOND MINE / 1997
DOVE Equipment & Machinery Co., Ltd. in 1997 supplied a complete set of Stationary Processing plant, with feed capacity of 150 Tons Solid/ Hour, and Ore throughput capacity of 120 Tons/ Hour solids, for recovery of Placer/Alluvial Gold. The plant was configured for direct dry feeding of Placer Ore by dump truck to the Ore-Feed Station. The recovery stages included the recovery of corse material (3 mm – 25 mm) utilizing Jig Concentrators, as well as undersize (- 3mm, down to 20 micron) utilizing VBS® Concentrators.