GUINEA / DIAMOND MINE / 2020

DIAMOND MINING EQUIPMENT FOR DIAMOND MINING PROJECT IN GUINEA

DOVE Equipment & Machinery Co., Ltd. in 2020 supplied 25-30 TPH Placer/Alluvial Processing Plant, wash plant for recovery of Diamonds. Based on the heavy and sticky clay condition present in the ore, the plant was configured with gold trommel classifier designed with special clay breaker module, as well as high pressure hydraulic spray jet network to break the heavy clay ore.

The classifier hopper also was equipped with hydraulic network and jets. The ore feed hopper was designed to be feed with dump hopper and also included the powerful hydraulic monitor to process the ore rapidly and engage in early treatment of the heavy clay.

Plant included wet-static Grizzly and ore feed channel configured with hydraulic network, rubber lined to eliminate clogging of ore.

Plant included multi stage concentrators, designed for 100% recovery of diamonds, with no loss.

Plant included complete production security system and locking mechanism to protect production against unauthorized access.

DOVE Trommel for Guinea
Jig Concentrator
DOVE Jig concentrator
Trommel at the DOVE factory