SIERRA LEONE / GOLD AND DIAMOND RIVER MINING OPERATION / 2017
SIERRA LEONE / GOLD AND DIAMOND RIVER MINING OPERATION / 2017
In August 2017 DOVE manufactured and commissioned one unit of RIVERMINER® model (RM-300GD), with capacity of 300 metric cube/Hour for river mining operation in Sierra Leone.
DOVE RIVERMINER® (RM-300GD) is a combination of the Dredge and Floating Processing plant, configured on pontoon. The combination of the Dredge and Floating Plant, installed on-board, provides the convenience of the continuous recovery of ore from the river bead, and simultaneous processing of ore and recovery of both Diamonds & Gold on the river, eliminating the hassle, cost, and production security risk of transporting the material onshore for processing.
DOVE RIVERMINER® is configured with security system and locking mechanism to protect the production against unauthorized access. The Floating Plant is designed for the recovery of coarse & fine mineral production.