hard rock gold project / Sierra Leone / 2022

SPEEDMINER® hard rock mobile plant for Sierra Leone

DOVE supplied SPEEDMINER® Hard Rock Gold Mobile Processing Plant  with processing capacity 8 TPH for Hard Rock Gold project in Sierra Leone.

Fully integrated, plant is designed for 100% recovery of gold and other metals production, with no loss, and down to 40 microns particle size.

SPEEDMINER® hard rock processing plant is fully mobile, configured on rugged trailers, and requires limited site preparation. Plant is designed with ore feeding, 2-stage reduction, screening, conveyor assembly, grinding module, slurry pumps, centrifugal gold concentrator and built-in power plant and fully integrated hydraulic and electrical network, as well as mobile centrifugal pump.

SPEEDMINER® Mobile Hard Rock Processing Plant is 100% environment-friendly, use no chemicals and require only recycled water.

SPEEDMINER Mobile Hard rock gold processing plant
SPEEDMINER Mobile Hard rock gold processing plant ball mill
SPEEDMINER Mobile Plant installation
SPEEDMINER Mobile Plant installation
SPEEDMINER Mobile Plant installation
SPEEDMINER Mobile Plant installation
Mobile Hard rock mining equipment
SPEEDMINER®
SPEEDMINER®
Mobile ball mill, grinding mill