hard rock gold project / Sierra Leone / 2022
SPEEDMINER® hard rock mobile plant for Sierra Leone
DOVE supplied SPEEDMINER® Hard Rock Gold Mobile Processing Plant with processing capacity 8 TPH for Hard Rock Gold project in Sierra Leone.
Fully integrated, plant is designed for 100% recovery of gold and other metals production, with no loss, and down to 40 microns particle size.
SPEEDMINER® hard rock processing plant is fully mobile, configured on rugged trailers, and requires limited site preparation. Plant is designed with ore feeding, 2-stage reduction, screening, conveyor assembly, grinding module, slurry pumps, centrifugal gold concentrator and built-in power plant and fully integrated hydraulic and electrical network, as well as mobile centrifugal pump.
SPEEDMINER® Mobile Hard Rock Processing Plant is 100% environment-friendly, use no chemicals and require only recycled water.