HARD ROCK GOLD PROJECT / SIERRA LEONE / 2023
SPEEDMINER® MOBILE HARD ROCK GOLD PROCESSING PLANT FOR SIERRA LEONE, CAPACITY 15 TPH.
SPEEDMINER® mobile hard rock processing plant is designed for 100% recovery of gold and other platinum group metals production, with no loss and down to 40 microns size.
SPEEDMINER® is 100% environment-friendly, uses only recycled water.
SPEEDMINER® plant is fully mobile plant configured on 3 full size rugged trailers, consisting of classification, ore feeding, 2-stage reduction, screening, conveyor assembly, grinding module, slurry pumps, centrifugal concentrator.
SPEEDMINER® plant is shipped in containers and require limited site preparation and is designed for rapid installation and operation.
Plant is supplied with mobile power plant (generator) and mobile centrifugal pump.
Plant is supplied with complete gold room designed for the final cleanup of gold concentrate and melting furnace to produce gold bars, including complete set of stamping tools.